Caltrans & SANDAG Pioneer CMGC in NCC Program
The roadway work resulted in 113,000 cubic yards of new Jointed Plain Concrete Pavement (JPCP).
The roadway work resulted in 113,000 cubic yards of new Jointed Plain Concrete Pavement (JPCP).
What goes into well-designed, correctly engineered concrete pavement roadways?
The Caltrans pilot project featured CDG, as well as Next Generation Concrete Surface (NGCS)
The scholarship winner, Kendra Lopez is a recent graduate of King City High School, finishing in the top three of her graduating class