Caltrans & SANDAG Pioneer CMGC in NCC Program
The roadway work resulted in 113,000 cubic yards of new Jointed Plain Concrete Pavement (JPCP).
The roadway work resulted in 113,000 cubic yards of new Jointed Plain Concrete Pavement (JPCP).
What goes into well-designed, correctly engineered concrete pavement roadways?
The Caltrans pilot project featured CDG, as well as Next Generation Concrete Surface (NGCS)
The scholarship winner, Kendra Lopez is a recent graduate of King City High School, finishing in the top three of her graduating class
The 30-mile stretch of I-10 across southeastern California is in bleak terrain that simmers in year-round desert heat
The boots-on-the-still-wet-pavement instruction focused on the project paving operations and included four hours on site plus seven hours in the project office
Tony Tavares was sworn in as the new Director of Caltrans by the Secretary of the California State Transportation Agency
The use of Rapid Strength Concrete (RSC) for roadway construction is extremely beneficial for today’s congested highways and the
Construction is currently underway on a $25-million project to reconstruct Taxiway L, the primary connector path for all departing
The Smart Pavement slabs are durable, precast concrete sections embedded with sensor and networking capabilities