Partnering with Caltrans Eliminates 10-Day Wait, Delivering Immediate and Significant Results
Nearly 90% of the California highway network was constructed between 1955 and 1975 with a designed lifespan of 20 years.
Nearly 90% of the California highway network was constructed between 1955 and 1975 with a designed lifespan of 20 years.
Over the span of a 53-year career, Richard (Dick) Moore has been actively involved in the advancement of concrete paving throughout the State of Nevada.
With more than a decade of Heavy Civil/Airfield experience, Southwest Concrete Paving Co. worked closely with the U.S. Army Corps of Engineers